August is here the main holidays in spain when most companies shutdown, due to this less work is going on at the moment but will restart after the august break. Work in avda la perla is paused at the moment, this work involves replacing water mains adding missing sewer pipes creating a pavement and street lighting to be finished off with re tarmacking.
   A causeway is being installed in the barranco in the lower part of los menchones to protect the houses alongside where land was being eroded.
   In los higuerales a section of sewrage piping is to be installed in C estrella del mar to join the two parts of a main, the higher part was diverted to a potho and this needs to be disconected, avda los higuerales by sea views is to have street lighting installed, by the park the rambla will get a wall to create extra space for the park by the mine with the possibility of an extra patanca pitch.
  Behind the school the rock wall protection has been built and a park/mirador is being created on top.
  iin campillo walls have been built facilitate the widening of the road in most parts and installation of footpaths from the village to the new roundabout in el rulador.
   In los torres soil is being stored in the entrance for to higher the road to allow connection to the sewer for two houses and widening of the entrance road to enable a footpath, we plan to move the buzons from the blind bend and place them by the bins which is a safer place to stop.
  Work shouild start soon for the road from the punta limpio down to the tanatorio gradually finishing the entrance to the arroyo. there is work in the village preparing for the fiesta.